News Room

02
Oct

02.10.2013

Dafora announces finishing the drilling operation for Rompetrol Well Services regarding drilling of Lupsa Sat 1 well. Total drilled depth was 4128 meters with an F320 drilling rig. No incidents...
Read More
25
Sep

25.09.2013

Dafora announces starting the drilling activity at 265 Colibasi well. The project is based on the contract signed with OMV Petrom . The projected depth is 2576 meters and the...
Read More
15
Sep

15.09.2013

Dafora announces starting the drilling activity at 367 Tintea well. The project is based on the contract signed with OMV Petrom . The projected depth is 3094 meters and the...
Read More
07
Sep

07.09.2013

Dafora announces finishing the drilling operation for OMV Petrom regarding drilling of 676 Tintea well. Total drilled depth was 2976 meters with an Bentec  drilling rig. No incidents were recorded,...
Read More
09
Jul

09.07.2013

Dafora announces finishing the drilling operation for AMROMCO regarding drilling of 1 Nadlac well. Total drilled depth was 2980 meters with an F125 tones drilling rig. No incidents were recorded,...
Read More
02
Jul

THE DRILLING JOBS OF 2 WELLS IN ISRAEL HAVE COMMENCED

The international market expansion represents one of Dafora’s development strategic directions approached by our company. After a rich experience in different markets such as Africa (Uganda, Tanzania, Sudan, Mozambique), France,...
Read More
17
Jun

17.06.2013

Dafora announces finishing the drilling operation for OMV Petrom regarding drilling of 20bis Adjud  well. Total drilled depth was 3000 meters with an Bentec drilling rig. No incidents were recorded,...
Read More
13
Jun

13.06.2013

Dafora announces starting the drilling activity at 676 Tintea well. The project is based on the contract signed with OMV Petrom . The projected depth is 2997 meters and the...
Read More
20
May

20.05.2013

Dafora announces starting the drilling activity at Meged 6 well. The project is based on the contract signed between Givot Olam as operator, Dafora Group as contractor and Dafora as...
Read More
15
May

15.05.2013

Dafora announces finishing the drilling operation for OMV Petrom regarding drilling of 767 Ludesti  well. Total drilled depth was 1450 meters with an MR 8000 drilling rig. No incidents were...
Read More
1 10 11 12 13 14