Dafora announces starting the drilling activity at 676 Tintea well. The project is based on the contract signed with OMV Petrom . The projected depth is 2997 meters and the operation will be carried out with our Bentec drilling rig.
13
Jun
Dafora announces starting the drilling activity at 676 Tintea well. The project is based on the contract signed with OMV Petrom . The projected depth is 2997 meters and the operation will be carried out with our Bentec drilling rig.