Dafora, as established in the Framework Agreement, announces start of the drilling operation for OMV Petrom at 678 Tintea well. The projected depth is 2700 meters and the operation will be carried out with our Bentec 350 AC drilling rig.
20
Nov
Dafora, as established in the Framework Agreement, announces start of the drilling operation for OMV Petrom at 678 Tintea well. The projected depth is 2700 meters and the operation will be carried out with our Bentec 350 AC drilling rig.