Dafora announces starting the drilling activity at RAG Kiha 1 well . The project is based on the contract signed with RAG KIHA Ltd. The projected depth is 2177 meters and the operation will be carried out with our MR 8000 drilling rig.
04
Dec
Dafora announces starting the drilling activity at RAG Kiha 1 well . The project is based on the contract signed with RAG KIHA Ltd. The projected depth is 2177 meters and the operation will be carried out with our MR 8000 drilling rig.